HG Construction has been appointed as the main contractor on an exclusive new trackside scheme, Escapade Silverstone.
The landmark scheme for Escapade will transform the trackside at the iconic Silverstone racetrack with 60 contemporary new residences and a clubhouse designed by architecture firm Twelve Architects.
The Escapade residences, which are available to purchase as an owner or stay in as a guest, have been billed as the ultimate experience for trackside enthusiasts, offering spacious, modern accommodation and driver-focused leisure facilities coupled with impressive views of the circuit.
The residences will offer guests light-filled entertaining spaces, high specification acoustics and ensuite bathrooms, in addition to car parking. The two-storey clubhouse will boast an indoor swimming pool and sauna along with treatment rooms on the ground floor, with floor-to-ceiling windows and dining facilities on the first floor as well as an 8.5 metre-high roof terrace.
Other amenities include a performance-focused gym and a private briefing room designed to enhance the year-round visitor experience at the UK’s only Grade 1 circuit.
Adam Quinn, Managing Director, HG Construction, said: “This is a really exciting project for HG Construction to be involved in given its iconic location and unique design. Twelve Architects have produced a sleek and stylish architectural concept which will complement and enhance the exceptional surroundings, and we are delighted to be bringing it to life on behalf of Escapade.
“We have worked closely with the client to ensure that the bespoke elements of the scheme are delivered in the most efficient and effective way possible, and we look forward to seeing the buildings emerge over the next few months.”
Will Tindall, founder & CEO of Escapade, said: “The opportunity to create something truly special at Silverstone requires partners who understand the nuances of such a challenging and complex location.
“Silverstone being a live racing circuit throughout the build, and the unique architectural and structural elements that make up our 14-acre project, mean we are pleased to work with HG on delivering our vision as it becomes reality. We look forward to welcoming guests from mid 2023 and will work closely with HG on all aspects of the project until completion.”